Week 20

This week work is really coming along nicely in several places.

The first floor spa area is really taking shape with most of the walls now complete:

Spa Walls

Work has continued on the spa area downstairs:

Spa floor going downTesting for leaks

Works in the pool hall is developing well. The contractors are due in this week to commence with the new ceiling/lighting:

Pool Hall

The new gym has been completely cleared ready for the new flooring to go down:

Ready for the flooringComing along well

And finally, the current demolition works on the dryside areas:

Main hall corridorThe old gym knocked through

The old changing areas

Week 19

This week things really progressed well in the new spa area.

The spa was filled with concrete:

Spa

The changing room walls were really taking shape:

External wallsView from the astro pitch

Next up is the gym on the first floor. With the floor complete, works on the electrical and cosmetic side could begin:

Free weights areaGym windows

Demolition began on the old dryside areas, where the Lifestyle Fitness Suite and changing rooms were:

Men's toilet

A new corridor is added on the main hall balcony which will divide this and the new gym access:

Main hall

Work started stripping out the old pool hall ceiling which had been up for 34 years:

Pool ceiling34 years of build up!

And last, but not least, the new water main being dug through the car park to feed the cafeteria:

New water mainWater main continued

Week 18

This week show that start of works on the new pool hall ceiling and the reconfiguration of the dryside changing area.

Firstly we start with the pool hall; the entrance was boarded up and scaffolding and boarding put up:
Pool entrance boarded up Boarded scaffolding over the pool

Next they began works on the dryside, stripping out and planning for demolition in the main hall corridor, old gym and changing areas:
Stripping out the main hall corridor Stripping out the old gym
Mens Changing Room marked out for demolition

Works also began on the overhaul of the pool plant room. Whilst the pool was shut, it was decided that it would be an ideal time for the sand in the filters to be replaced. We are also having 2 of the circulation pumps replaced. We had to remove sand from the filters which made quite a mess in the plant room!
Sand being removed from pool filters What a mess in the pool plant room!

Works have also continued in the spa extension. Spa pool pipe work and surrounds have gone in:
Spa pool pipework and surrounds going in Deep end view of the new spa pool

The changing rooms on the first floor of the spa extension are also coming along nicely with walls popping up left, right and centre and a new staircase and balcony almost complete:
Walls popping up for the spa changing rooms on the first floor New staircase and old main hall door on the first floor

That concludes this week's update. Things coming up over the next week include:

  • Start on the removal of the old pool hall ceiling
  • Demolition of walls in the dryside area
  • Continued works in the new gym area

Week 17

This week saw the completion of the ancillary hall, which has now been turned into the temporary location for the lifestyles fitness suite:
Ancillary Hall

These photos were taken first thing on Thursday morning and show how the old gym looked:
Old gym Another view of the old gym

Once all the gym equipment was taken out:
The old gym cleared of equipment

And finally, all the equipment in the temporary location:
Gym equipment in its temporary location

Work has continued in the new gym upstairs, with the ceiling going up:
Ceiling going up in the new gym Work to the ceiling in the new gym

The floor foundations have been laid in the new cafe area:
Floor foundations laid in the new cafe area

And finally the spa and changing extension have had new spa jets going in, work to the first floor changing area, the new lift shaft and fire exit staircase:
New spa jets going in First floor changing areas

New lift shaft New fire exit staircase