Week 20
This week work is really coming along nicely in several
places.
The first floor spa area is really taking shape with most of the
walls now complete:

Work has continued on the spa area downstairs:
 
Works in the pool hall is developing well. The contractors are
due in this week to commence with the new ceiling/lighting:

The new gym has been completely cleared ready for the new
flooring to go down:
 
And finally, the current demolition works on the dryside
areas:
 

Week 19
This week things really progressed well in the new spa area.
The spa was filled with concrete:

The changing room walls were really taking shape:
 
Next up is the gym on the first floor. With the floor complete,
works on the electrical and cosmetic side could begin:
 
Demolition began on the old dryside areas, where the Lifestyle
Fitness Suite and changing rooms were:

A new corridor is added on the main hall balcony which will
divide this and the new gym access:

Work started stripping out the old pool hall ceiling which had
been up for 34 years:
 
And last, but not least, the new water main being dug through
the car park to feed the cafeteria:
 
Week 18
This week show that start of works on the new pool hall ceiling
and the reconfiguration of the dryside changing area.
Firstly we start with the pool hall; the entrance was boarded up
and scaffolding and boarding put up:

Next they began works on the dryside, stripping out and planning
for demolition in the main hall corridor, old gym and changing
areas:


Works also began on the overhaul of the pool plant room. Whilst
the pool was shut, it was decided that it would be an ideal time
for the sand in the filters to be replaced. We are also having 2 of
the circulation pumps replaced. We had to remove sand from the
filters which made quite a mess in the plant room!

Works have also continued in the spa extension. Spa pool pipe
work and surrounds have gone in:

The changing rooms on the first floor of the spa extension are
also coming along nicely with walls popping up left, right and
centre and a new staircase and balcony almost complete:

That concludes this week's update. Things coming up over the
next week include:
- Start on the removal of the old pool hall ceiling
- Demolition of walls in the dryside area
- Continued works in the new gym area
Week 17
This week saw the completion of the ancillary hall, which has
now been turned into the temporary location for the lifestyles
fitness suite:

These photos were taken first thing on Thursday morning and show
how the old gym looked:

Once all the gym equipment was taken out:

And finally, all the equipment in the temporary location:

Work has continued in the new gym upstairs, with the ceiling
going up:

The floor foundations have been laid in the new cafe area:

And finally the spa and changing extension have had new spa jets
going in, work to the first floor changing area, the new lift shaft
and fire exit staircase: